As the house is well and truly locked up, it gets harder to get inside and take photos and not much has occurred outside. A change to outside was the tank stand has been put in and the tank should be arriving in the next couple of days. Now we just need some rain to fill it.

The bathroom and ensuite has been finished except for the shower screens and mirrors. This is the kids bathroom. Vanity and bath installed, tiled and almost ready for use. There is a power point missing but when these photos were taken, the electrician was in the house finishing off all the electical points and switches.


The bath and tiles in the ensuite. The IXL tastic has also been installed.


The vanity in the ensuite with tiles outlining where the mirror will ultimately be.


We were able to leverage off the tiler that NDH uses to lay our own tiles for downstairs. It saved the time of having a tiler come in and do the wet areas and then once hand over occurs, getting the same or another tiler to lay the tiles for our flooring. The tiles did look really good when they were first laid but now with workmen walking on them, they look a bit dirty.


The living and meals areas have also been tiled so other than two rooms to be carpeted, downstairs flooring is virtually complete.
The powder room downstairs has been nicely finished off. Not long now before we will be moving in.





1 comment:

Anonymous said...

Hi, the display also has hardie cladding on the back, I should know , I own it!