The stairs have been completed so now the kids can see the upstairs and where their rooms are going to be. This looking from the top of the stairs. You can also see a shelf which we weren't aware that we were getting so a pleasant little surprise. Now we just have to figure out what we are going to put there.
And a view of the stairs from the bottom. The stairs will be ultimately carpeted.
Doors are ready to be installed and the folding door to the ensuite is in sections.
What's behind the round window? Now all can be revealed. The ensuite to the master bedroom. The bath is directly behind it and the shower base to the left. The vanity will be on the right.
Architraves and skirting boards have also been delivered and so we should start to see those installed this week.
A view of the upstairs, looking through the doorway of the master bedroom down to the what will ultimately be the boys room at the end. The doorway on the left is nothing exciting - just the linen press. The media/study area is the open space on the right.
A view of the upstairs, looking through the doorway of the master bedroom down to the what will ultimately be the boys room at the end. The doorway on the left is nothing exciting - just the linen press. The media/study area is the open space on the right.
What's behind the round window? Now all can be revealed. The ensuite to the master bedroom. The bath is directly behind it and the shower base to the left. The vanity will be on the right.