And a view of the stairs from the bottom. The stairs will be ultimately carpeted.

Doors are ready to be installed and the folding door to the ensuite is in sections.

Architraves and skirting boards have also been delivered and so we should start to see those installed this week.

A view of the upstairs, looking through the doorway of the master bedroom down to the what will ultimately be the boys room at the end. The doorway on the left is nothing exciting - just the linen press. The media/study area is the open space on the right.

What's behind the round window? Now all can be revealed. The ensuite to the master bedroom. The bath is directly behind it and the shower base to the left. The vanity will be on the right.
2 comments:
Your house is certainly coming along.
We are trying to get a start with NDH. They insist on a 9 month building period but hope to finish in 6. Is this the case with you also? It would seem you will be well finished with in 9 months
ps. I think the brick columns look good, a bit of a traditional feel.
Mudmap
Yes we also have a 9 month building period but it looks as though they will be finished in just over a month. If you allow for Christmas then it's only a 6 month build time.
Kev